Corporate Office | Showroom | Factory | Warehouse |
Structure | Foundation | Reinforced concrete footings |
Framework | Office - Reinforced concrete frame Factory - Metal frame |
|
Bricks | Walls | Bricks with cement plastering |
Roof | Metal roofing sheet with insulator | |
Roof Structure | Metal construction | |
Ceiling | Ground & First Floor Office |
Skim coat / suspended ceiling |
Windows | Ground & First Floor Factory, Entrance, Office, Manager's Room & Dining |
Aluminium frame, glass window |
Toilet | Aluminium frame top hung window | |
Doors | Ground & First Floor Manager's Room & Toilet |
Plywood flush door |
Office | 1 hour fire rated door / Aluminium frame swing door |
|
Factory | M.S roller shutter | |
Locks | Factory, Office & Toilet | Quality Cylindrical Lockset |
Flooring | Factory, Office, Dining, toilet & Staircase | Ceramic tiles |
Factory | Power floated | |
Wall Tiles | Toilet | 7' 0" high ceramic tiles |
Sanitary Fittings | Aluminium sink | 1 no. |
Sitting W.C | 4 nos. | |
Washbasin | 4 nos. | |
Electrical Installation | Light point | 39 nos. |
Emergency light | 15 nos. | |
'Keluar' sign | 6 nos. | |
13 amp plug point | 15 nos. | |
Telephone point | 4 nos. |